MRP of alternative bom

Advertisement
Hi gurus,
how can i ensure explosion of desired alternative BOM during MRP run? Setting of BOM explosion strategy by production version is not helping. I am using mySAP ECC 6.0
Thanks and regards
Abhik
Advertisement

Replay

Hello Abhik,
You have more options. You can use:
- lot size (defined in BOM header)
- production version (several option you have: lot size, manually assign a PV to a planned order) - it was mentioned by you
- you can use explosion date (OPPP, Logistcs > Production > MRP > Master Data > BOM by date)
MRP 4 (in material master) > 'BOM explosion/dependent requirement' tab > you can set selection method according to your wish.
Details:
http://help.sap.com/saphelp_46c/helpdata/en/f4/7d2b1144af11d182b40000e829fbfe/frameset.htm
BR
Csaba

Number of Alternative BOM

Greetibgs ,                How Many number of  alternative BOM, we can created in standard system.Dear, In that case you need to define 99 production version then you have to decide which production version you want to use for actual production as pe

Alternative bom

i have one finish product '' A '' ( say ), In one case to create '' A '' I require one  raw materials as AA and one packing material as BB . Secondly to create "A" i sometimes require AA (Row material ) & CC ( Packing material ) . This dipen

Standard BOM with Alternative BOM

Dear Experts, We are having a requirement of comparing Standard BOM with actual material consumption. We got Actual consumption. When we were trying to get the standard BOM component, standard Data source is not available. Then we searched in SDN and

No alternative BOM field in STPO

Friends, I am creating functional specs for BOM explosion. I am following steps, 1. Get BOM number from MAST 2. Get alternative BOMs for above BOM nos from STKO 3. For all above alternatives fetch item details from STPO. The issue is when I try fetch

Exploding Latest Alternative BOM

Dear Gurus, I have two alternative BOMs of same material. They have same validity period and lot size. I dont want to use Production Version. Now, when I create a production order no BOM is exploded, the system throws an information message saying: "

Alternative BOM in Subcontarcting PO

Greetings....                   How to select the alternative BOM in Subcontarcting Purchase Order,...Dear, You need to create new production version in the material master, need to assign the BOM for Alternate BOM in the production version. You assi

MRP/RDA/ME59/BOM

Hi guys, I have two great questions to ask you: 1-  I have run MRP that has created a Purchase Request with item category 'L' and so with bill of materials. Then I created a Purchase order with tr.ME59 but this PO has not taken  the components from P

T COde CS15 : Report is not showing the "Alternative BOM No" for some BOMs

Hello Guru, I am facing a problem for the transaction CS15, when I use this transaction, in the output for some materials, system is not showing "Alternative number" of BOM. I cheked Deletion indicator, status of the BOM, validity period etc. Bu

Alternative BOM picking at the time of creating sales order.

Dear All, I have on requirment and it is as follows. I have 3 alternative BOMS for one material in same plant.Now sales order is created for this materila which alternatibe BOM will system pick. If there any possibility to customise alternative BOM p

MRP Plan - Alternate BOM vs Substitute Component

We have certain situations where ITEM B (length 5 in) can be used in place of ITEM A (length 3 in) in which just the amount cut off differs.  To be recognized in MRP planning and work order creation, should an alternate BOM be used or a substitute co

Mass Delete of Alternative BOM

Hi, Good day. I would just like to verify if there is a transaction code that we could use in order to mass delete the alterantive BOMs of materials. Thank you in advance. JMTafallaHi Jasmin, First of all, in Tcode CS28 give variant name and then cli

Alternae BOM during MRP RUN

Dear PP Gurus, I have a finished product for which there are 2 bom,  When I  run MRP for this finished product , which BOM system will consider? Is  there anyway by which  i can deicde which BOM it  should consider? Please help. ThanksDear, If a prod

PR( purchase requ) for Alternative material in BOM

Hi PP expert, I am using alternative material in BOM. As for example my Header BOM material is u2018Yu2019 and his alternative components  are  X1 and X2 I have done setting in BOM For - X1,------ Priority  ---1 Strategy  -  2 ,100% Usage prob     10

If we use alternvative BOM, How could we do backflush or MRP running?

Hi Experts If we plan to create two parts, and setup it in BOM as alternative parts.How SAP do the backflush or run requirements for it?  Will it consume each parts qty? Since in stock , there will be two parts stock qty onhand. Thanks AliceHi jagadi

Create Bom with alternative using CSAP_MAT_BOM_MAINTAIN

Hi all, I am trying to create a new alternative BOM and thought I had to use the function CSAP_MAT_BOM_MAINTAIN. Creating new BOMs with CSAP_MAT_BOM_CREATE works as well as maintaining them with CSAP_MAT_BOM_MAINTAIN, but I fail in creating a new alt

Costing shows high value due to BOM alternative material

Hi, In BOM we have maintained alternative material for few line items.(not maintained alternative BOM) When we do the standard cost run system is taking main material and alternative material value. so the cost of the product is showing high. How sys

The BOM alternative 1,2

Hi, We have created one BOM (alternative 1) with date (valid from10.01.2008) and 2 Months later we kept the same BOM and created (alternative 2) with date (valid from 10.03.2008). We will always (re)create the same BOM with new alternative every 2 Mo

BOM Explode in Subcontracting

Hi Friends, I have following BOMs for same material. A = B+ C A = B+ D A = B + F I have maintained the same thru alternate BOM. Each alternate BOM is assigned to differnt Vendor (manually outside SAP) Is it posiible I get different items for each ven

How to Block Planning for PIR related Dependend Requirements of a BOM Comp?

Hi All, We have a scenario which has a FERT Material "XY" has a BOM with ROH Materials "C1", "C2" & "C3". Material "XY" has a PIR for 100 pc and on MRP Run it generates Dep Reqmnt for C1, C2 & C3.